Maintenance Manager with 12 years in industrial plants. Lead a team of 9 technicians across mechanical, electrical and instrumentation, owning the preventive programme and line availability.
B.S. in Mechanical Engineering
Regional Institute of Technology · 2014
Total Productive Maintenance Certificate
Workforce Training Institute · 2020
Maintenance is measured by what does not happen: the plant did not stop, the equipment did not fail, production did not slip. That is why a maintenance manager's resume must speak in uptime, unplanned downtime and PM compliance. A resume that only lists equipment repaired describes a technician, not someone who manages plant reliability.
Use them only where they are true for you: the filter searches for them, but the recruiter verifies them in the interview.
Want to know whether your current resume uses these keywords and whether ATS filters can read it? Analyze it free — three checks a day, no sign-up.
The step up is proven through management, not technical skill. If you scheduled work orders, kept equipment history, coordinated other technicians, controlled spares or built the PM plan, write it in that language: those are supervisory functions even if your title was technician. Learn a CMMS, even a basic one — it separates you fastest from a pure technician. Add industrial safety and root cause analysis training. And prepare one example of a recurring failure you eliminated at the source, because that is the question that decides the interview.
Document management functions you already performed: work order scheduling, equipment history, technician coordination, spares control, PM plan development.
Equipment uptime, unplanned downtime and PM compliance. If you did not track them, describe program coverage and the asset base you maintained.
Very. It distinguishes organized management from reactive work. If you have not used one, learning a basic system is a worthwhile investment.
With a case: "Shifted 60% of interventions from corrective to planned in the first year through a criticality-based PM program". Concrete and verifiable.
Yes. Industrial maintenance means after-hours calls. Stating it clearly puts you ahead.
Answer 14 questions and the AI builds your resume from your real experience. Nothing invented.